2C roadwork locations on Westside listed through Aug. 7 Here are the locations scheduled by City Public Works for 2C road upgrades on the Westside during the time frame of July 25-Aug. 7.
Included is overnight work (8 p.m.-8 a.m.) on the Garden of the Gods streets. During this time, the park itself will be closed, as will the roads. Work locations: - Monroe Street from Sage Street to Seventh Street - digout. - Wheeler Avenue from Westend Avenue to 21st Street - concrete work. - Gateway Road from 30th Street to Juniper Way Loop - overlay. - Juniper Way Loop at Gateway Road - overlay. - Garden Drive from Juniper Way Loop to park entrance - overlay. - Garden Lane at Garden Drive - overlay. Note that there could be traffic impacts at any time in the work locations, including the temporary loss of a through lane or even a detour around the site. 2C was the name of the city-sponsored ballot measure that voters approved in last November's election. It established a .62 percent sales tax over a five-year span, dedicated to road improvements. The upgrades consist of concrete upgrades (where applicable) and new paving on a prioritized list of road segments. A city website with 2C information can be found at https://coloradosprings.gov/public-works/page/right-way-infrastructure- maintenance-funding.
Westside Pioneer/press release
Would you like to respond to this article? The Westside Pioneer welcomes letters at editor@westsidepioneer.com. (Click here for letter-writing criteria.) |