Water-line work to keep Mesa Road closed from 19th to Uintah until end of January
“We're installing 20-inch and 8-inch-diameter PVC pipes and removing a water main out of a private right-of-way,” said Colorado Springs Utilities spokesperson Steve Berry. The project started Jan. 18. Signs have been posted advising motorists that the section of Mesa Road between Uintah Street and 19th Street is currently not open to through traffic.
Westside Pioneer/press release
Would you like to respond to this article? The Westside Pioneer welcomes letters at editor@westsidepioneer.com. (Click here for letter-writing criteria.) |